Orbit
✎  New chat
🔍  Search chats
TODAY
Ashford Landing Lot 42 Status
Plan 2260 Slab Dimension Variance
Framing Labor Overage by Community
YESTERDAY
Cycle Time by Superintendent
Draw 7 Package for Ashford Landing
Lumber Price Increase Impact
PREVIOUS 7 DAYS
Homes Closed Year to Date
Interest Carry by Community
Trade Payment Aging Over 45 Days
Option Take Rate Plan 2260
Change Orders Not Billed to Buyer
Start Pace Against Release Schedule
PREVIOUS 30 DAYS
Warranty Claims by Trade
THREADKORE
ORBIT DEMO
Sample data

Where should we start?

Ashford Landing, Plan and Unit Variance
38 lots · 22 closed · 16 active · Generated from the job cost ledger
Back to chat
Export
Send to Dana
Lot 42, Plan 2260
$3,343
Net variance over. 32nd of 38.
Community average
$1,480
Over, across all 38 lots
Plan 2260 average
$2,880
Over, across 11 lots
All other plans
$910
Over, across 27 lots

All 38 lots by net variance Low to high

Community average $1,480
Lot 42, $3,343
Lot 17, bestLot 29, worst

Average variance by plan Dollars over

Plan 1980
$310
Plan 2050
$640
Plan 2110
$1,240
Plan 2185
$1,970
Plan 2260
$2,880

Lot 42, where the money went Cost codes with variance. All other codes at budget.

Cost codeBudgetActualVarianceBillable to buyerCause
03100  Framing labor18,40020,400+2,000NoReturn crew and trim standby, frame inspection hold
15400  Plumbing rough9,85013,373+3,523PartialCO-114 pool bath $2,180 billed · CO-119 drain $1,343 not billed
03300  Concrete flatwork11,20011,2000n/aAt budget
16100  Electrical rough8,6008,6000n/aAt budget
Net unbilled variance+3,343$2,180 recovered at closing

Lot 42 schedule Day 48 of a 74 day target. Two days behind.

Day 0
Form boards
Day 31 to 34
Frame inspection hold
Day 48
Today
Day 74
Target CO
Hold cost3 days
Recovered1 day
Net position2 days behind
Community average cycle71 days

Plan 2260 exposure Same slab dimension, same drain relocation

Lot 08
Lot 12
Lot 19
Lot 24
Lot 29
Lot 33
Lot 37
Lot 42
Lot 47
Lot 51
Lot 55
Lots affected4 of 11
Unbilled to date$5,372
Starts in next 45 days7 homes
Projected if unchanged$9,400

Best unit

Lot 17, Plan 1980
$410 under budget, 66 days form boards to CO.

Worst unit

Lot 29, Plan 2260
$4,905 over budget, 78 days. Same drain relocation.

Recommended action

Correct the Plan 2260 slab dimension before the next release.
The drain lands under a bearing wall because the slab sheet does not match the framing layout. Four of the five worst units in the community are Plan 2260. Seven homes start in the next 45 days.
Flag plan sheet to Dana
Rebudget remaining releases
Open CO-119
Ask Orbit
+ Advanced
Auto ⌄
Illustrative demo · Sample dataIllustrative walkthrough · Sample data

This scripted walkthrough uses sample data. It is not a live production session.

Your privacy choices

May we measure visits, estimate your country, state/region and city, and use advertising cookies? Accept enables optional tracking and Google, Meta, and LinkedIn tags. Decline keeps it off.

What we collect

With your permission, we save page views, navigation and button clicks, scroll depth, successful request counts, and page-load and responsiveness measurements for future reports. These activity records never include form contents, names, email addresses, or raw IP addresses.

We also save a network-based country, state/region and city estimate provided by our hosting service. We never request GPS access or store coordinates, street addresses, or postal codes. Estimates may be inaccurate, especially with a VPN, and unavailable locations stay unknown.

New location records expire after 720 days and are excluded from current reports then. Records collected under an earlier 90-day choice keep that shorter expiration. Expired records are cleared as the site receives requests; no location history is backfilled from visits before this consent.

We also keep anonymous, grouped operational counts of request errors, missing pages, form failures, and rate limits to maintain the site. These are separate from optional visitor analytics and contain no visitor identifiers or submitted details.

Google, Meta, and LinkedIn may use cookies to measure visits and personalize advertising. Your choice is remembered for six months; you can change it here at any time. Contact forms work either way.